The maintenance of the concrete mixer reducer

2017-05-31

 The maintenance of the concrete mixer reducer

1, in the process of put into use, often need to observe the oil level of reducer observation.Find the center line of the oil level is lower than the observation mouth should be timely when filling oil.If found oil qualitative change dirty, should change in time.

2, put into use for the first time 50 hours, need to replace the lubricating oil.After six months to replace at least once every 1000 hours or reducer lubricating oil.
3, the first oil change note, should be mixing console, the oil after it finished, you need to clean about 2 liters of lubricating oil reducer, refueling.
4, in the later in the process of the oil change, such as brands have change, also want to wash reducer with lubricating oil.